Half-timbered house made of glued beams
The project of the Fachwerk house is designed for one family. The house has two bedrooms, a study, and two bathrooms. The base of the house is a half-timbered frame made of glued beams. The construction period of this project is 6 months.
Half-timbered house
Project190-2
Total square:190 m2
Warm square:154 m2
Square 1 level:82 m2
Square 2 level:72 m2
Total square:
190 m2